Friday
NEW STICKER
well we finally ran out of our get rad stickers. so we had to order more to keep up with the demand for people wanting to rock the stickers. so we decided to make it a bit bigger, and change the design. if you want this sticker. you can email us your address and we will send it out (note though the new sticker will not be here for about 7 days) so if you email us now we will only send out the stickers we have left in stock. Our email address is functiontheory.com@gmail.com
Thursday
FUNCTION CERTIFIED
Check out robs all motor high comp ka24de running a staggering 12-1 compression. He participates in local drifting events such as Koss Motorsport Events and drift wise events. I love the style of his car.
1993 Nissan 240sx Coupe
KA24DE High Comp
Bored .040 Over
Single Cam KA Pistons
S14 Exhaust Manifold w/ 3in Downpipe
Megan Racing Muffler
AEM Intake
Work Emotion CR KAIS 18 x9.5 +12 Offset Wheels
D2 Coilovers
S14 RUCAS
S14 FLCAS
S14 5 Lug Swap
BN Sports Body kit
1993 Nissan 240sx Coupe
KA24DE High Comp
Bored .040 Over
Single Cam KA Pistons
S14 Exhaust Manifold w/ 3in Downpipe
Megan Racing Muffler
AEM Intake
Work Emotion CR KAIS 18 x9.5 +12 Offset Wheels
D2 Coilovers
S14 RUCAS
S14 FLCAS
S14 5 Lug Swap
BN Sports Body kit
Saturday
RB25sx
i know i know... posting has been a little slow lately. well pretty much no posting. but i have a good reason. a side from working my real job, i have been spending all my other free time on the RB25sx drift car project. below you can see what i have done in the past week. motor out cleaned the engine bay, stitch welded it, painted it. installed solid steering rack aluminum bushing, put sub frame collars in, put welded diff in, put teins on it, put my exhaust on, installed the rb25det, and some other small things. this is only part one of the build. the wiring specialties harness is still out of stock for 3 more weeks. i will soon get the front mount and some other goodies then i will do a part two of the build once i get those items in. please be patient as the posting will steadily start flowing in again once the project is all done. it has been hellish with the weather in las vegas has been in the 100's....
here is a link to my flickr with all the pictures so far of the swap. CLICK HERE
and below are just a few from the flickr
here is a link to my flickr with all the pictures so far of the swap. CLICK HERE
and below are just a few from the flickr
Subscribe to:
Posts (Atom)