i know i know... posting has been a little slow lately. well pretty much no posting. but i have a good reason. a side from working my real job, i have been spending all my other free time on the RB25sx drift car project. below you can see what i have done in the past week. motor out cleaned the engine bay, stitch welded it, painted it. installed solid steering rack aluminum bushing, put sub frame collars in, put welded diff in, put teins on it, put my exhaust on, installed the rb25det, and some other small things. this is only part one of the build. the wiring specialties harness is still out of stock for 3 more weeks. i will soon get the front mount and some other goodies then i will do a part two of the build once i get those items in. please be patient as the posting will steadily start flowing in again once the project is all done. it has been hellish with the weather in las vegas has been in the 100's....
here is a link to my flickr with all the pictures so far of the swap. CLICK HERE
and below are just a few from the flickr
No comments:
Post a Comment